OUR SOLUTIONS

GET MORE RELIABILITY DONE.

NU REJUVENATION

UG CableCure® Injection Program

Make aging UG cable like-new for way less than replacement

NU REHAB

Total UG Reliability Program

Rejuvenate + Replace + Enhance

NU SPECIALTY

Specialty Crews and Services

Crew-based and Technical Services to help you deliver clean, cost-effective reliability

OUR SOLUTIONS

GET MORE RELIABILITY DONE.

NU REJUVENATION

UG CableCure® Injection Program

Make aging UG cable like-new for way less than replacement

NU REHAB

Total UG Reliability Program

Rejuvenate + Replace + Enhance

NU SPECIALTY

Specialty Crews and Services

Crew-based and Technical Services to help you deliver clean, cost-effective reliability

NU REJUVENATION

UG CableCure® Injection Program

Silicone-based injection to make your aging UG cable like-new for way less than replacement.

COST-EFFECTIVE

Average cost of rejuvenation is one-third or less the cost of replacement

CAPITAL-EFFICIENT

FERC and RUS approved for efficient deployment of your capital

CUSTOMER-FRIENDLY

Saves destruction of customers’ yards, average time to address segment < 90 minutes

SYSTEM-FRIENDLY

Requires very little of your time and your staff’s attention – trained crew can work directly with dispatchers

SUSTAINABLE

Novinium Rejuvenation has helped utilities mitigate approximately 660K metric tons of CO2

COST-EFFECTIVE

Average cost of rejuvenation is one-third or less the cost of replacement

CAPITAL-EFFICIENT

FERC and RUS approved for efficient deployment of your capital

CUSTOMER-FRIENDLY

Saves destruction of customers’ yards, average time to address segment < 90 minutes

SYSTEM-FRIENDLY

Requires very little of your time and your staff’s attention – trained crew can work directly with dispatchers

SUSTAINABLE

Novinium Rejuvenation has helped utilities mitigate approximately 660K metric tons of CO2

COST-EFFECTIVE

Average cost of rejuvenation is one-third or less the cost of replacement

CAPITAL-EFFICIENT

FERC and RUS approved for efficient deployment of your capital

CUSTOMER-FRIENDLY

Saves destruction of customers’ yards, average time to address segment < 90 minutes

SYSTEM-FRIENDLY

Requires very little of your time and your staff’s attention – trained crew can work directly with dispatchers

SUSTAINABLE

Novinium Rejuvenation has helped utilities mitigate approximately 660K metric tons of CO2

FROM FEEDER TO METER

Feeder
UG Distribution Cable
Primary
URD Cable
Secondary
URD Cable

FROM FEEDER TO METER

FEEDER
UG Distribution Cable
PRIMARY
URD Cable
SECONDARY
URD Cable

CABLES WE REJUVENATE

Cable Type
and Size

• Feeder, primary, and secondary
• #4 AWG – 1000MCM
Neutrals

• Bare concentric
or jacketed

• NC Level 1 – Level 3
Insulation
• PE or EPR

• 0.525″ to
1.870″ OD

Conductors
• Concentric or compressed
• Copper or aluminum
Voltage Rating
• URD: 15kV to 35kV
• 5kV up to 69kV
• Less than 600 volts

CABLES WE REJUVENATE

Cable Type
and Size

• Feeder, primary, and secondary
• #4 AWG – 1000MCM
Neutrals

• Bare concentric
or jacketed

• NC Level 1 – Level 3
Insulation
• PE or EPR

• 0.525″ to
1.870″ OD

Conductors
• Concentric or compressed
• Copper or aluminum
Voltage Rating
• URD: 15kV to 35kV
• 5kV up to 69kV
• Less than 600 volts

CABLES WE REJUVENATE

Cable Type and Size

• Feeder, primary, and secondary

• #4 AWG – 1000MCM

Neutrals

• Bare concentric or jacketed

• NC Level 1 – Level 3

Insulation

• PE or EPR

• 0.525″ to 1.870″ OD

Conductors

• Concentric or compressed

• Copper or aluminum

Voltage Rating

• URD: 15kV to 35kV

• 5kV up to 69kV

• Less than 600 volts

“Our holistic approach to improving the reliability of our aging URD infrastructure has been extremely successful. We’ve restored the addressed population of cable to new, or like-new condition, while essentially eliminating cable failures—at 34% of the cost of replacing all of the cable.“

Sr. Distribution Engineer, Midwestern Municipal Electric Utility

NU REHAB

Total UG Reliability Program

Boost your UG system reliability, productivity and resilience with the programmatic, high quality NU REHAB solution.

REJUVENATE

Rejuvenate as much cable as possible

REPLACE

Repair or replace any remaining cable segments

ENHANCE

Implement new advanced energy infrastructure

PROGRAM WORKFLOW

ASSESS

System
Cable
Equipment

SOLUTION

Determination
& Prioritization

REHAB

Rejuvenate
Replace

INSTALL

Replacement Equipment
New Equipment

MANAGE

Switching
Coordination

TRACK
& REPORT

Productivity

PROGRAM WORKFLOW

ASSESS

System
Cable
Equipment

SOLUTION

Determination & Prioritization

REHAB

Rejuvenate
Replace

INSTALL

Replacement Equipment
New Equipment

MANAGE

Switching Coordination

TRACK & REPORT

Productivity

“Novinium does an outstanding job.
We try to use them for anything we can – we have that much confidence in them.”

Sr. Dir. Distribution Services, Top 5 U.S. Investor-Owned Utility

NU SPECIALTY

Specialty Crews and Services

Crew-based and Technical Services to help you keep the lights on in the most efficient, cost-effective way.

TECHNICAL SERVICES

Assessment

Program/Project
Management

Power & Control
Technical Services

System
Integration

TECHNICAL SERVICES

Assessment

Program/Project
Management

Power & Control
Technical Services

System
Integration

TECHNICAL SERVICES

Assessment

Program/Project Management

Power & Control Technical Services

System Integration

CREW SERVICES

Inspection
Services

Transformer
Changeouts

Equipment
Replacement

Storm
Response

CREW SERVICES

Inspection
Services

Transformer
Changeouts

Equipment
Replacement

Storm
Response

CREW SERVICES

Inspection Services

Transformer Changeouts

Equipment Replacement

Storm Response